Difference between revisions of "Target"

From GlueXWiki
Jump to: navigation, search
Line 5: Line 5:
 
<h1>Meetings</h1>
 
<h1>Meetings</h1>
  
[[GlueX Target Meetings]]
+
* [[GlueX Target Meetings]]
 
+
<h4> 2009 April 17, 10:00-11:00 F326 </h4>
+
 
+
The agenda is not strict and should accommodate discussions
+
* General requirements for the GlueX target 10 min
+
*# LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
+
*# Beam power in LH2 < 100 uW (high luminocity)
+
*# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target]
+
*# Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
+
*# Solid targets (discussion)
+
* Cryo supply (George) 5 min
+
* General requirements to the PRIMEX target (Rory) 5 min
+
* Target group view (Chris) 10 min
+
* Providing specs - discussion
+

Revision as of 19:21, 30 September 2011

Costs and Schedule

Meetings