|
|
Line 5: |
Line 5: |
| <h1>Meetings</h1> | | <h1>Meetings</h1> |
| | | |
− | [[GlueX Target Meetings]] | + | * [[GlueX Target Meetings]] |
− | | + | |
− | <h4> 2009 April 17, 10:00-11:00 F326 </h4>
| + | |
− | | + | |
− | The agenda is not strict and should accommodate discussions
| + | |
− | * General requirements for the GlueX target 10 min
| + | |
− | *# LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
| + | |
− | *# Beam power in LH2 < 100 uW (high luminocity)
| + | |
− | *# Hall B target adapted to Hall D: [http://www.jlab.org/~whitey/HALL_D_HYDROGEN_TARGET.pdf Hall D hydrogen target]
| + | |
− | *# Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
| + | |
− | *# Solid targets (discussion)
| + | |
− | * Cryo supply (George) 5 min
| + | |
− | * General requirements to the PRIMEX target (Rory) 5 min
| + | |
− | * Target group view (Chris) 10 min
| + | |
− | * Providing specs - discussion
| + | |