Difference between revisions of "Target"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 +
=Costs and Schedule=
 +
 +
* Proposed [[Media:ETC target 21dec10.xlsx|ETC changes]] from Tim Whitlatch.
 +
 
<h1>Meetings</h1>
 
<h1>Meetings</h1>
  

Revision as of 11:24, 22 December 2010

Costs and Schedule

Meetings

2009 April 17, 10:00-11:00 F326

The agenda is not strict and should accommodate discussions

  • General requirements for the GlueX target 10 min
    1. LH2 target 30 cm long, 2 cm diameter (for 3.4 mm collimator)
    2. Beam power in LH2 < 100 uW (high luminocity)
    3. Hall B target adapted to Hall D: Hall D hydrogen target
    4. Continuous vacuum from Pair Spectrometer to the target? (requirements: pressure, interlocks etc)
    5. Solid targets (discussion)
  • Cryo supply (George) 5 min
  • General requirements to the PRIMEX target (Rory) 5 min
  • Target group view (Chris) 10 min
  • Providing specs - discussion