Difference between revisions of "September 30, 2022 Tech group meeting"
From GlueXWiki
(Created page with "= Meeting Time and Place == Friday September 30, 2022 9:30am TED 2559 and Teams == Agenda == * Safety - ? * Promotion * FCAL2 Schedule * January Schedule ** Get DIRC operat...") |
(→Agenda) |
||
Line 8: | Line 8: | ||
* Promotion | * Promotion | ||
* FCAL2 Schedule | * FCAL2 Schedule | ||
− | * January Schedule | + | * January Schedule 3rd-14th |
** Get DIRC operational | ** Get DIRC operational | ||
** Modify Tagger Microscope | ** Modify Tagger Microscope |
Revision as of 05:49, 30 September 2022
Meeting Time and Place =
Friday September 30, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - ?
- Promotion
- FCAL2 Schedule
- January Schedule 3rd-14th
- Get DIRC operational
- Modify Tagger Microscope
- Install New Profiler
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 144 steel housings should be annealed
- FCAL2 Design tidbits
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass
- Tungsten
- Insulation
- Electronic patch panels
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks -
- Cooling Manifold arrived and in ESB
- Weld water manifold supports
- Bend/solder copper tubes
- JBweld conductive epoxy tubes to blocks
- HDList updates
- GEM detector install?
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobbly will be responsible for PLC
- DIRC vacuum pump cooling water off - to install new orifice
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas