Difference between revisions of "September 30, 2022 Tech group meeting"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 5: Line 5:
 
== Agenda ==
 
== Agenda ==
  
* Safety -  ?
+
* Safety -  Hurricane Ian
 
* Promotion
 
* Promotion
 
* FCAL2 Schedule
 
* FCAL2 Schedule

Latest revision as of 08:39, 30 September 2022

Meeting Time and Place =

Friday September 30, 2022 9:30am TED 2559 and Teams

Agenda

  • Safety - Hurricane Ian
  • Promotion
  • FCAL2 Schedule
  • January Schedule 3rd-14th
    • Get DIRC operational
    • Modify Tagger Microscope
    • Install New Profiler
  • Hall D current Tasks
    • FCAL Insert Module fabrication
      • brass straps
      • matching mu metal to steel shields - 144 steel housings should be annealed
    • FCAL2 Design tidbits
      • need cooling pipe to chiller assy
      • need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
      • need installation drawing
      • insert plexiglass
      • Tungsten
      • Insulation
      • Electronic patch panels
    • FCAL2 Assembly
      • Assemble FCAL2 step plates/cooling blocks -
      • Cooling Manifold arrived and in ESB
      • Weld water manifold supports
      • Bend/solder copper tubes
      • JBweld conductive epoxy tubes to blocks
      • HDList updates
    • GEM detector install?
    • KLONG dwgs
  • Controls - Bobbly will be responsible for PLC
  • DIRC vacuum pump cooling water off - to install new orifice
  • General Maintenance
  • On Call -
  • ePAS Training and trial https://www.jlab.org/esh/epas

Action Items