Difference between revisions of "September 21, 2022 FCAL Insert Installation Meeting"

From GlueXWiki
Jump to: navigation, search
(Minutes)
(Action Items)
Line 24: Line 24:
  
 
== Action Items ==
 
== Action Items ==
* Make a virtual 3D Mock up of baseline (Tim and Stephanie)
 
** Assume HV and LV cables come from top and bottom
 
** Assume signal cables are rg174 and patch in from downstream wall
 
** Assume signal cables come along center pipe and fan out to crystals
 
** Get samples of wires from Chris S. to use for model
 
* Develop an lead-glass module unstacking plan (Sasha)
 
** Criteria for category of repairs
 
** # of bins
 
** repair plan
 
* Get quote on RG174 cables and connectors (Chris S.)
 
* Come up with cable mapping plan (Fernando)
 

Revision as of 16:15, 20 September 2022

Meeting Time and Place

Wednesday September 21,2022 10am At Jefferson Lab, Hall D Counting House and on Teams

Agenda

Step assy.jpeg
Manifold assy.jpeg
Blocks.jpeg
DS platform.jpeg
FCAL upper cable trays.jpeg
FCAL BL Lower cabletrays.jpeg
FCAL BR Lower cabletrays.jpeg

Minutes

Action Items