Difference between revisions of "September 21, 2022 FCAL Insert Installation Meeting"
From GlueXWiki
(→Agenda) |
(→Meeting Time and Place) |
||
Line 1: | Line 1: | ||
== Meeting Time and Place == | == Meeting Time and Place == | ||
− | Wednesday September | + | Wednesday September 21,2022 10am |
At Jefferson Lab, Hall D Counting House and on Teams | At Jefferson Lab, Hall D Counting House and on Teams | ||
Revision as of 15:09, 20 September 2022
Meeting Time and Place
Wednesday September 21,2022 10am At Jefferson Lab, Hall D Counting House and on Teams
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/September_07,_2022_FCAL_Insert_Installation_Meeting
- Discuss Lead Glass and crystal module removal/install - Sasha
- Crystal signal cable concept - Stephanie
- Cable mapping requirements - Fernando
- Existing cables
- New Cables
- Assembly in ESB
- Media:FCAL2_strawman_schedule.pdf
Minutes
- I showed the strawman schedule and then how to handle the lead glass modules. The discussion then went right into cabling, which was discussed for the duration.
- Sasha brought up the need for categorizing the existing modules before unstacking and then keep them separate.
- Sasha to write a plan on how to categorize and repair the modules
- determine existing problems
- inspect as removed and decide which bin to go into
- determine number of bins
- those with no issues, keep whole
- Crates can handle around 1500 lbs
- should modules be removed from upstream or downstream?
- Develop space plan based on Sasha'a plan (Tim)
- Sasha to write a plan on how to categorize and repair the modules
- Cable discussion
- How many new cable trays do we need (depends on plan)
- 1600 new HV cables (through side wall patch panels)
- 1600 new LV cables (through side wall patch panels) - ribbon cable daisy chained on inside?
- 1200 or 1600 new signal cables depending if we reuse existing 400 cables
- Do we remove all cables completely or just on detector end?
- If only on one end?
- the loose cables need to be supported and stowed somehow
- little space left for work on platform
- Less work for cabling folks
- How to remove 400 existing signal cables
- Remove cables completely?
- Can remove racks so there is room to work on the platform
- More work for cable folks
- If only on one end?
- How to route and support additional cables?
- Bring HV and LV cables from patch panel on side walls
- Route them from top and bottom to center
- Add additional chain in Z to handle additional cables
- Use smaller diameter (RGA 174 (2.8mm diam.)) for signal cables?
- Route through patch panel or connector from DS wall
- bring along center pipe and fan out?
- need to decide on connectors and length
- Bring HV and LV cables from patch panel on side walls
Action Items
- Make a virtual 3D Mock up of baseline (Tim and Stephanie)
- Assume HV and LV cables come from top and bottom
- Assume signal cables are rg174 and patch in from downstream wall
- Assume signal cables come along center pipe and fan out to crystals
- Get samples of wires from Chris S. to use for model
- Develop an lead-glass module unstacking plan (Sasha)
- Criteria for category of repairs
- # of bins
- repair plan
- Get quote on RG174 cables and connectors (Chris S.)
- Come up with cable mapping plan (Fernando)