Difference between revisions of "September 12, 2017 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
 
Line 20: Line 20:
 
# Optical box
 
# Optical box
 
#* Design and PMT mounting update [https://halldweb.jlab.org/wiki/images/9/97/20170912_Status_Update.pdf (Jason)]
 
#* Design and PMT mounting update [https://halldweb.jlab.org/wiki/images/9/97/20170912_Status_Update.pdf (Jason)]
#* Simulation studies (Maria and Roman)
+
#* Simulation studies (Maria and Roman) - [https://gluexdirc.mit.edu/transmittance-measured-greg-1 transmittance data, batch 2 (Maria)]
 
#* Electronics (Fernando)
 
#* Electronics (Fernando)
 
# Bar box transportation and monitoring  
 
# Bar box transportation and monitoring  

Latest revision as of 14:18, 12 September 2017

Meeting Information

GlueX DIRC Meeting
Tuesday September 12, 2017
1:00 pm, EDT
JLab room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Support structure update (John)
  3. Optical box
  4. Bar box transportation and monitoring
  5. Water system update (Tim)
  6. Nitrogen system in Hall (Tom)
  7. AOB