  • I showed the strawman schedule and then how to handle the lead glass modules. The discussion then went right into cabling, which was discussed for the duration.
  • Sasha brought up the need for categorizing the existing modules before unstacking and then keep them separate.
    • Sasha to write a plan on how to categorize and repair the modules
      • determine existing problems
      • inspect as removed and decide which bin to go into
      • determine number of bins
      • those with no issues, keep whole
    • Crates can handle around 1500 lbs
    • should modules be removed from upstream or downstream?
    • Develop space plan based on Sasha'a plan (Tim)
  • Cable discussion
    • How many new cable trays do we need (depends on plan)
    • 1600 new HV cables (through side wall patch panels)
    • 1600 new LV cables (through side wall patch panels) - ribbon cable daisy chained on inside?
    • Do we remove all cables completely or just on detector end?
      • If only on one end,
        • the loose cables need to be