Difference between revisions of "September 06, 2013 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/gluex" to "https://halldweb.jlab.org")
 
(4 intermediate revisions by 3 users not shown)
Line 13: Line 13:
  
 
# Update on SLAC visit and preparation of conceptual design document
 
# Update on SLAC visit and preparation of conceptual design document
# Report on visit of Argonne's MCP-PMT R&D facilities [[File:Argonne_MCPPMT_201308.pdf]]
+
# Report on visit of Argonne's MCP-PMT R&D facilities [[https://halldweb.jlab.org/DocDB/0022/002290/001/Argonne_MCPPMT.pdf slides]]
 +
# Resolution and refraction index: [https://halldweb.jlab.org/wiki/index.php/File:Presentation_090613.pdf]

Latest revision as of 12:39, 14 March 2017

Meeting Time and Place

Friday September 06, 2013 at 1:30pm

Connections

To connect from the outside, please use ESNET or SeeVogh

  1. ) ESNET: 8542553
  2. ) SeeVogh: A conference has been booked under "GlueX PID Upgrade" from 1:00pm until 3:00pm (EDT).
    1. ) To phone into an SeeVogh meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code, 155025.
    2. ) To use the SeeVogh Java script use the SeeVogh link.

Agenda

  1. Update on SLAC visit and preparation of conceptual design document
  2. Report on visit of Argonne's MCP-PMT R&D facilities [slides]
  3. Resolution and refraction index: [1]