SRC FCAL time/energy calibrations

From GlueXWiki
Revision as of 17:24, 12 January 2022 by Ijaegle (Talk | contribs)

Jump to: navigation, search
  1. Periods
    • D, 7 days or periods
    • period 1 / run range: 90207-90208 / number of runs:2
    • period 2 / run range: 90209-90225 / number of runs:15

period 3 / run range: 90226-90241 / number of runs:11 period 4 / run range: 90242-90249 / number of runs:8 period 5 / run range: 90558-90571 / number of runs:13 period 6 / run range: 90572-90589 / number of runs:18 period 7 / run range: 90590-90601 / number of runs:12

    • He, 17 days or periods
    • C, 19 days or periods
  1. Gain matching calibration plots
  2. Checking the FCAL gains
  3. Energy dependence correction monitoring plots