Run preparation check list

From GlueXWiki
Revision as of 12:56, 29 July 2022 by Somov (Talk | contribs)

Jump to: navigation, search
  • TAGH / TAGM
  1. Move tagger microscope (Tim, eng)
  2. Install plate with TAGH counters (Tim, eng)
  3. Connect cables (Nick/Chris)
  4. Install fixed TAGH counters (Chris, Sasha)
  5. Allign TAGH/TAGM (survey group)
  • CCAL installation
  1. Install CCAL movable platform