Run preparation check list

From GlueXWiki
Revision as of 12:53, 29 July 2022 by Somov (Talk | contribs)

Jump to: navigation, search
  • Move tagger microscope (Tim, eng)
  • Install plate with TAGH counters (Tim, eng)
  • Connect cables (Nick/Chris)
  • Install fixed TAGH counters (Chris, Sasha)
  • Allign TAGH/TAGM (survey group)