Difference between revisions of "Run preparation check list"

From GlueXWiki
Jump to: navigation, search
Line 9: Line 9:
 
* CCAL installation
 
* CCAL installation
  
# Install CCAL movable platform
+
# Install CCAL movable platform (Tim, eng)
 +
# Install CCAL on the platform (Tim, eng)]
 +
# Connect cables (Sasha, Vlad, Arshak, Chris)
 
#
 
#

Revision as of 12:58, 29 July 2022

  • TAGH / TAGM
  1. Move tagger microscope (Tim, eng)
  2. Install plate with TAGH counters (Tim, eng)
  3. Connect cables (Nick/Chris)
  4. Install fixed TAGH counters (Chris, Sasha)
  5. Allign TAGH/TAGM (survey group)
  • CCAL installation
  1. Install CCAL movable platform (Tim, eng)
  2. Install CCAL on the platform (Tim, eng)]
  3. Connect cables (Sasha, Vlad, Arshak, Chris)