Difference between revisions of "Run preparation check list"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
# Move tagger microscope (Tim, eng)
 
# Move tagger microscope (Tim, eng)
 
 
# Install  plate with TAGH counters (Tim, eng)
 
# Install  plate with TAGH counters (Tim, eng)
 
+
# Connect cables (Nick/Chris)
* Connect cables (Nick/Chris)
+
# Install fixed TAGH counters (Chris, Sasha)
 
+
# Allign TAGH/TAGM  (survey group)
* Install fixed TAGH counters (Chris, Sasha)
+
 
+
* Allign TAGH/TAGM  (survey group)
+

Revision as of 12:54, 29 July 2022

  1. Move tagger microscope (Tim, eng)
  2. Install plate with TAGH counters (Tim, eng)
  3. Connect cables (Nick/Chris)
  4. Install fixed TAGH counters (Chris, Sasha)
  5. Allign TAGH/TAGM (survey group)