Run Planning Meeting Notes, September 1 - September 7, 2022

From GlueXWiki
Revision as of 11:22, 3 September 2022 by Sfegan (Talk | contribs)

Jump to: navigation, search

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday, September 5

Labor Day Holiday Special (9.30am, note one-off different time)

Weekend Run Updates

Issues from the weekend

Plan

Sunday, September 4

  • No Meeting
  • Production Running on Be target at 100 nA
  • Trigger studies
  • Run details from logbook

Saturday, September 3

Friday, September 2

Past 24 hours

Issues

  • Shift crew just reported that Ar and CO2 cylinders are low
  • DAQ issues late night
  • Hydra very slow updating last night (>10,000 seconds)

Plan

  • Intensity scan; 3 shifts each at 50nA and 100 nA, 12 shifts at 200 nA (almost 6 completed)
  • Trigger Studies
  • Access needed to restore target comms
  • Solenoid ramp down Monday, zero field runs Tuesday
  • Target change intended for Wednesday

Thursday, September 1

Past 24 hours

Issues

Plan

  • Brief accelerator downtime around 1pm for preventative maintenance on a UPS in the injector
  • Trigger study (Sasha)
  • Detector checkout (raw mode for ADCs & pi0 for FCAL)
  • Intensity scan?
  • Physics production
    • Take data with B-field (six shifts at 200 nA, then two each at 100 nA and 50 nA)

Further Information

The hot checkout page

Readiness Check List

  • Solenoid (Eugene/Beni)
    • Start the run with magnetic field on
  • Surveys (Tim/Mark)
    • FCAL survey
    • TOF survey
    • ST survey
    • TAGM
    • TAGH
    • Survey beamline component (secondary collimator, PS, beam pipe downstream the PS, etc.)
    • Survey CCAL after it's installed in the Hall
  • DAQ (Sergei).
    • Include CDC1, ST, and CCAL crates to the readout. Power the detector, continue taking cosmic data during the detector configuration change.
  • Trigger (Alex S.)
    • Check physics triggers
    • Run CCAL trigger when the detector is installed in the Hall
    • Connect / check CCAL LED and alpha triggers
  • Beam line
    • Install He beam pipe between FCAL and CCAL (Tim)
    • Install led shielding wall in front downstream the PS (Tim)
    • Radiator status
      • Check amorphous radiator
    • Tagger hodoscope (A. Somov)
      • Install plates with TAGH counters
      • Install / check repaired TAGH countes
    • Tagger microscope (Tim / Richard Jones)
      • Move TAGM to the new location and rotate
    • Collimator Motion (Hovanes)
      • Not changed
    • Active collimator detectors(Richard Jones/Alexandre Deur)
      • Move active collimator to 5 mm hole
      • Check
    • Profiler (Hovanes)
      • Not changed
    • Luminosity monitor (Hovanes)
      • Not changed
    • Halo monitors
      • Not changed
    • PS system (Alex Somov)
      • Not changed
    • Beam line magnets (PS magnet sweeping magnet and tagger quads).
      • Change filed of the PS magnet
    • Polarimeter (Sebastian Cole/M. Dugger)
      • Optional, not used in PrimEx
    • Targets (Chris/Tim/Alexandre D.)
      • LH4
      • Be
    • TAC (Alex Somov/Hovanes)
      • Use CCAL (TAC can be used as a backup)
    • Slow control (Hovanes)
      • Check CCAL
    • RF (Sergei)
      • Not changed
    • Radiation monitors (Alexandre D.)
      • Not changed
  • Detector systems
    • ST (Beni)
      • Connect cables, check dark rate
    • FDC (Lubomir)
      • Not changed
    • CDC (Beni)
      • Move CDC1 crate to the nominal position, cable up
      • Check readout
    • BCal (Mark D. / Elton)
      • Not changed
    • FCal (Mark D.)
      • Check / replace bases if needed
    • ComCal (Alex Somov)
      • Check detector controls (Nick)
      • Install CCAL platform
      • Check platform motion
      • Installed detector on the platform
      • Connect cables
      • Connect LMS
      • Check detector
    • TOF (Beni)
      • Remove inner acrylic absorber