Run Planning Meeting Notes, September 16 - September 23, 2021

From GlueXWiki
Revision as of 09:47, 18 September 2021 by Billlee (Talk | contribs) (Saturday, September 18)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 16

  1. Last 24 hours:
  2. Report/issue
  3. Run plan
    • Wait for beam delivery. Begin experiment commissioning. Run plan

Friday, September 17

  1. Last 24 hours:
  2. HARP Scan results: https://logbooks.jlab.org/entry/3906296
  3. Report/issue
    • AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Improved significantly by the new microphone by Matt
      • A longer USB to micro USB cable will further improve the remote shift experience
  4. Run plan
    • Run plan
    • Complete beam configuration (Hovanes) after fixing Active collimator
    • Detector checkout
      • Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
    • Low Current 2nA run this afternoon (during Mike's shift)
    • Empty target run again overnight?

Saturday, September 18

  1. Last 24 hours:
    • AC Fixed at 9:30 am
      • Voltage cable was attached but not locked.
  2. Shift Summary:


  1. Overnight: snake scan.
  2. Present: snake scan ongoing.
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Good enough for now. Fin tweak needed. Remote shifters: please give feedback.
  3. Run plan
    • TAGM checkout to be completed (Richard)
    • Beryllium target installation
      • 6:30am, Beam.
      • 7:00am- 7:30am, radcon survey of beamline target area.
      • 7:30am- 8:00am, Survey & alignment setup
      • 8:00am-8:30am, removing components (Target & start counter)
      • 8:30am, Berylium target installaion by target group (with Imani's presents)
      • Total work duration: 14 hours
      • Currently planned for Monday.
    • A Possibility of mantainace day on Tuesday.