Difference between revisions of "Run Planning Meeting Notes, September 16 - September 23, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, September 17)
(Tuesday, September 17)
Line 35: Line 35:
 
#** Improved significantly by the new microphone by Matt
 
#** Improved significantly by the new microphone by Matt
 
#** A longer USB to micro USB cable will further improve the remote shift experience
 
#** A longer USB to micro USB cable will further improve the remote shift experience
#* PS Magnet is still turned off
 
 
# Run plan
 
# Run plan
 
#* [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]
 
#* [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]

Revision as of 09:32, 18 September 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 16

  1. Last 24 hours:
  2. Report/issue
  3. Run plan
    • Wait for beam delivery. Begin experiment commissioning. Run plan

Tuesday, September 17

  1. Last 24 hours:
  2. HARP Scan results: https://logbooks.jlab.org/entry/3906296
  3. Report/issue
    • AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Improved significantly by the new microphone by Matt
      • A longer USB to micro USB cable will further improve the remote shift experience
  4. Run plan
    • Run plan
    • Complete beam configuration (Hovanes) after fixing Active collimator
    • Detector checkout
      • Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
    • Low Current 2nA run this afternoon (during Mike's shift)
    • Empty target run again overnight?