Difference between revisions of "Run Planning Meeting Notes, September 16 - September 23, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, September 16)
Line 15: Line 15:
 
# Run plan
 
# Run plan
 
#* Wait for beam delivery.  Begin experiment commissioning. [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]
 
#* Wait for beam delivery.  Begin experiment commissioning. [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]
 +
 +
=Tuesday, September 17=
 +
# Last 24 hours:
 +
#* Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
 +
#** Day Shift summary: https://logbooks.jlab.org/entry/3906056
 +
#** Swing summary: https://logbooks.jlab.org/entry/3906229
 +
#** Owl summary: https://logbooks.jlab.org/entry/3906383
 +
#** Early Riser Summary: https://logbooks.jlab.org/entry/3906545
 +
# HARP Scan results: https://logbooks.jlab.org/entry/3906296
 +
#* Signal to background too high or pedestal shifted (require adjustment)? : https://logbooks.jlab.org/entry/3906283
 +
#* Tagger Gamma counter rate comparison: last night vs 2020 for same radiator: https://logbooks.jlab.org/entry/3906326
 +
#* Evident suggest pedestal for the Halo monitor shifted
 +
#* Empty target run overnight
 +
#** Without Active collimator
 +
# Report/issue
 +
#* AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
 +
#** Radcon is escorting Nick into the collimator cave for checking
 +
#* Counting house microphone issue:
 +
#** Improved significantly by the new microphone by Matt
 +
#** A longer USB to micro USB cable will further improve the remote shift experience
 +
#* PS Magnet is still turned off
 +
# Run plan
 +
#* [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Run plan]
 +
#* Complete beam configuration (Hovanes) after fixing Active collimator
 +
#* Detector checkout
 +
#** Contact persons: Rachard (): , Drew : , Sasha: , Igal: , Tyler: .
 +
#* Low Current 2nA run this afternoon (during Mike's shift)
 +
#* Empty target run again overnight?

Revision as of 08:42, 17 September 2021

<- Back to Run Coordination Meetings:Summer2021

Tuesday, September 16

  1. Last 24 hours:
  2. Report/issue
  3. Run plan
    • Wait for beam delivery. Begin experiment commissioning. Run plan

Tuesday, September 17

  1. Last 24 hours:
  2. HARP Scan results: https://logbooks.jlab.org/entry/3906296
  3. Report/issue
    • AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
      • Radcon is escorting Nick into the collimator cave for checking
    • Counting house microphone issue:
      • Improved significantly by the new microphone by Matt
      • A longer USB to micro USB cable will further improve the remote shift experience
    • PS Magnet is still turned off
  4. Run plan
    • Run plan
    • Complete beam configuration (Hovanes) after fixing Active collimator
    • Detector checkout
      • Contact persons: Rachard (): , Drew : , Sasha: , Igal: , Tyler: .
    • Low Current 2nA run this afternoon (during Mike's shift)
    • Empty target run again overnight?