Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"
From GlueXWiki
(→Thursday , Sep 20 at 08:45) |
(→Thursday , Sep 20 at 08:45) |
||
Line 9: | Line 9: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
#CEBAF: | #CEBAF: | ||
− | #* Arc 5 trips. Possible | + | #* Arc 5 trips With overtemp. Possible bad kilxon. |
− | #* 5th pass separator issue | + | #* 5th pass separator (horizontal) issue |
#* currently at 9R | #* currently at 9R | ||
#* Today’s plan: Maintenance with NL access | #* Today’s plan: Maintenance with NL access |
Revision as of 08:07, 20 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips With overtemp. Possible bad kilxon.
- 5th pass separator (horizontal) issue
- currently at 9R
- Today’s plan: Maintenance with NL access
- Hall D closed @3pm today
- Action Items:
- Hot Check OUT Status 8% ready ; 1% checked ; 91% not ready
- Issues
- Reports:
- Run Plan
- AOB