Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"
From GlueXWiki
(Created page with "<- Back to Run Coordination Meetings:Fall2018 Run <!-- * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment -...") |
(→Thursday , Sep 20 at 08:45) |
||
Line 9: | Line 9: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
#CEBAF: | #CEBAF: | ||
− | #* | + | #* Arc 5 trips. Possible Mechanical issue |
− | #* | + | #* 5th pass separator issue |
+ | #* currently at 9R | ||
+ | #* Today’s plan: Maintenance with NL access | ||
+ | #* Hall D closed @3pm today | ||
#Action Items: | #Action Items: | ||
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready </span> | #* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=®ionId=29&groupId=&qualified= Hot Check OUT Status] <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready </span> |
Revision as of 07:53, 20 September 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Thursday , Sep 20 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- Arc 5 trips. Possible Mechanical issue
- 5th pass separator issue
- currently at 9R
- Today’s plan: Maintenance with NL access
- Hall D closed @3pm today
- Action Items:
- Hot Check OUT Status 8% ready ; 1% checked ; 91% not ready
- Issues
- Reports:
- Run Plan
- AOB