Difference between revisions of "Run Planning Meeting Notes, Sep 20-27, 2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings:Fall2018 Run <!-- * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-01/index.html Trigger graphs] Comment -...")
 
(Thursday , Sep 20 at 08:45)
Line 9: Line 9:
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#CEBAF:
 
#CEBAF:
#*  
+
#* Arc 5 trips. Possible Mechanical issue
#*  
+
#* 5th pass separator issue
 +
#* currently at 9R
 +
#* Today’s plan: Maintenance with NL access
 +
#* Hall D closed @3pm today
 
#Action Items:
 
#Action Items:
 
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready  </span>
 
#* [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&categoryId=401&systemId=&regionId=29&groupId=&qualified= Hot Check OUT Status]  <span style="color:green"> 8% ready </span>; <span style="color:#BABC3A">1% checked </span>; <span style="color:red">91% not ready  </span>

Revision as of 07:53, 20 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Thursday , Sep 20 at 08:45

  1. Notes from the previous 24 hours:
  2. CEBAF:
    • Arc 5 trips. Possible Mechanical issue
    • 5th pass separator issue
    • currently at 9R
    • Today’s plan: Maintenance with NL access
    • Hall D closed @3pm today
  3. Action Items:
  4. Issues
  5. Reports:
  6. Run Plan
  7. AOB