(Tuesday, October 12)
(Tuesday, October 12)
Line 1: Line 1:
 
=Tuesday, October 12=
 
=Tuesday, October 12=
 
# In last 24 hours:
 
# In last 24 hours:
#* Early Riser:  
+
#* Early Riser: https://logbooks.jlab.org/entry/3922503
 
#* Owl summary: https://logbooks.jlab.org/entry/3922367
 
#* Owl summary: https://logbooks.jlab.org/entry/3922367
 
#* Swing summary: https://logbooks.jlab.org/entry/3922242
 
#* Swing summary: https://logbooks.jlab.org/entry/3922242

Revision as of 07:03, 12 October 2021

Tuesday, October 12

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn