Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Tuesday, October 12)
(Tuesday, October 12)
Line 7: Line 7:
 
#* Solenoid Refrigerator maintenance https://logbooks.jlab.org/entry/3922021 & https://logbooks.jlab.org/entry/3922069 (Tim)
 
#* Solenoid Refrigerator maintenance https://logbooks.jlab.org/entry/3922021 & https://logbooks.jlab.org/entry/3922069 (Tim)
 
# Issues:
 
# Issues:
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
+
#* Bleedthrough
 
#* 10 FCAL bases need to be changed soon https://logbooks.jlab.org/entry/3922169 (Mark)
 
#* 10 FCAL bases need to be changed soon https://logbooks.jlab.org/entry/3922169 (Mark)
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
  
 
=Monday, October 11=
 
=Monday, October 11=

Revision as of 14:31, 11 October 2021

Tuesday, October 12

  1. In last 24 hours:
  2. Issues:
  3. Plan:

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn