Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, October 11)
(Monday, October 11)
Line 23: Line 23:
 
#** Early Riser:  
 
#** Early Riser:  
 
#** Owl summary:  
 
#** Owl summary:  
#** Swing summary:  
+
#** Swing summary: https://logbooks.jlab.org/entry/3921392
 
#** Day summary: https://logbooks.jlab.org/entry/3921282
 
#** Day summary: https://logbooks.jlab.org/entry/3921282
 
#Issues:
 
#Issues:

Revision as of 16:48, 10 October 2021

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:
    • No beam between 9am and 1pm
    • Ramp up solenoid at 9am

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn