Difference between revisions of "Run Planning Meeting Notes, October 7 - October 13, 2021"

From GlueXWiki
Jump to: navigation, search
(Monday, October 11)
(Monday, October 11)
Line 29: Line 29:
 
#* DAQ CCAL alarm https://logbooks.jlab.org/entry/3920676
 
#* DAQ CCAL alarm https://logbooks.jlab.org/entry/3920676
 
#* (Solenoid alarm https://logbooks.jlab.org/entry/3920696 (Elton/Keith))
 
#* (Solenoid alarm https://logbooks.jlab.org/entry/3920696 (Elton/Keith))
#* rootstpy problem
+
#* rootstpy problem due to connection to ccdb solved by using squilte (David)
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#[https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 
#* No beam between 9am and 1pm
 
#* No beam between 9am and 1pm

Revision as of 21:16, 9 October 2021

Monday, October 11

  1. In last 72 hours:
  2. Issues:
  3. Plan:
    • No beam between 9am and 1pm
    • Ramp up solenoid at 9am

Friday, October 8

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • 100 nA (2 shifts)
    • Turn the magnet on and ramp to low current (50A)
    • Hall A will be back online Monday morning
    • Tuesday Beam study / RF recovery will probably be postponed to a later day

Thursday, October 7

  1. In last 24 hours:
  2. Issues:
  3. Plan:
    • Special run for BCAL, TPOL retracted, 5 mn beam at 200 nA, normal DAQ cfg
    • 200 nA CDC & FDC turn off (3 shifts)
    • 100 nA CDC & FDC turn off (2 shifts)
    • MCC will run the Moller at helicity flip rate for HallB which might disrupt HallD beam
    • If Hall A is back online today (unlikely most probably tomorrow)
      • Check radiation
      • HARP scan
      • Bleedthrough run with 10 kHz random pulser, HallD laser turn off, and no beam for 40mn