=Wednesday November 03=
 
=Wednesday November 03=
 
#Last 24h:
 
#Last 24h:
#* Recorded XXM+ events with full LHe4 target
+
#* Recorded 1029M+ events with full LHe4 target
#*  
+
#* [https://logbooks.jlab.org/entry/3936040 U1-9-TOP reboot]
 +
#* [https://logbooks.jlab.org/entry/3936068 runai on gluon47 hangs]
 +
#* Some repeated trouble with RootSpy [https://logbooks.jlab.org/entry/3936227] and DAQ comments box [https://logbooks.jlab.org/entry/3936204]
 
#Issues:
 
#Issues:
 
#* Bleedthrough
 
#* Bleedthrough
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
+
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]  
#* Continue production at 200nA with the solenoid on.
+
#* '''TODAY: Maintenance day'''
#* Since Hall A cannot run at present, we are the priority hall.
+
#* Continue production at 200nA with the solenoid on after that.
#* '''Maintenance day tomorrow, Wed 11/03'''
+
#* MCC (Jay) discussed possibility to move up the energy shift to Thu, swing
 
#** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581])
 
#** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581])
 
#* Beam energy change planned for 11/05-11/07  
 
#* Beam energy change planned for 11/05-11/07  
 +
#** RadCon survey for friday morning is requested
 +
#* Next RC will be Alex Austregesilo
 
=Tuesday November 02=
 
=Tuesday November 02=
 
#Last 24h:
 
#Last 24h:

Latest revision as of 08:23, 3 November 2021

MCC whiteboard Meeting Bluejeans 660743227

Wednesday November 03

  1. Last 24h:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • TODAY: Maintenance day
    • Continue production at 200nA with the solenoid on after that.
    • MCC (Jay) discussed possibility to move up the energy shift to Thu, swing
      • Controlled access planned for maintenance work (e.g. FCAL [3])
    • Beam energy change planned for 11/05-11/07
      • RadCon survey for friday morning is requested
    • Next RC will be Alex Austregesilo

Tuesday November 02

  1. Last 24h:
  2. Issues:
    • Bleedthrough
  3. Plan:
    • Continue production at 200nA with the solenoid on.
    • Since Hall A cannot run at present, we are the priority hall.
    • Maintenance day tomorrow, Wed 11/03
      • Controlled access planned for maintenance work (e.g. FCAL [6])
    • Beam energy change planned for 11/05-11/07

Monday November 01

  1. Over the weekend:
    • Recorded 331M events from Fri, 8am till target was emptied. Then 1400M+ events with empty target until now
    • Comment box on DAQ machine did not show up -> restarting DAQ brought it back. Missing comments for some runs recorded in logbook [7]
    • Follow-up Re: Follow-up Re: TAGH scalers, roctagh2
    • Target was emptied at 6:10pm Firday [8]
    • BCAL noise at 10 o'clock
    • Note on neutron background in Hall D
    • Over the weekend, reference plots have been updated to reflect status with empty target [9]
    • When we run with empty target, dont run AI for CDC HV. Stay with 2125V fixed value [10]
    • power cycle of rocTAGH1, rocTAGH2, restart DAQ due to frozen TAGH scalers
    • Spooky halloween shift - accelerator became unstable (lots of RF trips) sunday night [11]
    • Target will be filled this morning (after the meeting). Chris C requested short access during filling to watch target interlock panel
  2. Issues:
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • Continue production at 200nA with the solenoid on.
    • Since Hall A cannot run at present, we are the priority hall.
    • Maintenance day on Wed 11/03 beam will be shut off at ~6am
      • Hall D will go into controlled access for maintenance work (FCAL, ...?)
    • Beam energy change planned for 11/05-11/07
    • Hall A scheduled to come back online on Monday, 11/08

Friday October 29

  1. Last 24h:
    • Recorded 1090M+ events
    • Change out of C02
    • RadCon replaced light bulb (was really broken) in our rapid access beacon with an LED bulb
      • Access was necessary, but machine was actually down during that time
    • RCDB web interface was unreachable, shift crew contacted administrator and the service was restarted
    • HallC BCM calibration should not have affected us, but they use varying beam currents for that procedure, which may have changed bleedthrough during run 81620 (see [12])
    • New wiki page with short-term guidance for shifters [13]
    • Beam - RF Timing differences with different trigger types
    • RAID beeping in DAQ room
  2. Issues:
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • Continue production at 200nA with the solenoid on.
    • Since Hall A cannot run at present, we are the priority hall.
    • Maintenance day shifted to Wed 11/03
    • Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A

Thursday October 28

  1. Last 24h:
  2. Issues:
  3. Plan:
    • Continue production at 200nA with the solenoid on.
    • Since Hall A cannot run at present, we are the priority hall.
    • Hall C BCM calibration moved to today (Thursday) 2:30pm.
    • Maintenance day planned for Tue 11/02
    • Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A