Difference between revisions of "Run Planning Meeting Notes, October 28 - November 3, 2021"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
=Thursday 28 October=
 
=Thursday 28 October=
 
#Last 24h:
 
#Last 24h:
#* Recorded 431M+ events
+
#* Recorded 949M+ events
 
#* [https://logbooks.jlab.org/entry/3933197 Emergency Control box intermittent alarms ]
 
#* [https://logbooks.jlab.org/entry/3933197 Emergency Control box intermittent alarms ]
 
#* [https://logbooks.jlab.org/entry/3933263 TAGH scalers froze (roctagh2)]; TAGH1 and TAGH2 crates power cycled
 
#* [https://logbooks.jlab.org/entry/3933263 TAGH scalers froze (roctagh2)]; TAGH1 and TAGH2 crates power cycled
 
#* Some issues with starting root spy ([https://logbooks.jlab.org/entry/3933234 see day shift summary])
 
#* Some issues with starting root spy ([https://logbooks.jlab.org/entry/3933234 see day shift summary])
#* [https://cebaf.jlab.org/dtm/open-events?event_id=12451 XXhrs Downtime due to issue with magnet shunt module]
+
#* 2.5hrs downtime due to issue with magnet shunt module (has been replaced)
#** Chris C (target) requested access to check heater power supply of the condenser.
+
#** Chris C (target) requested access to check heater power supply of the condenser [https://logbooks.jlab.org/entry/3933441].
 
#** Our rapid access beacon is not working again ([https://logbooks.jlab.org/entry/3933422 turning, but no light!])
 
#** Our rapid access beacon is not working again ([https://logbooks.jlab.org/entry/3933422 turning, but no light!])
 
#** RadCon escorted Chris in and out of the hall.
 
#** RadCon escorted Chris in and out of the hall.
 +
#*
 
#Issues:
 
#Issues:
#* Get rapid access beacon fixed
+
#* Rapid access beacon
 
#* Low energy tagger counters?
 
#* Low energy tagger counters?
 
#* BCAL noise at 10 o'clock
 
#* BCAL noise at 10 o'clock

Revision as of 07:43, 28 October 2021

MCC whiteboard Meeting Bluejeans 660743227

Thursday 28 October

  1. Last 24h:
  2. Issues:
  3. Plan:
    • Continue production at 200nA with the solenoid on.
    • Since Hall A cannot run at present, we are the priority hall.
    • Hall C BCM calibration moved to today (Thursday) 2:30pm.