Difference between revisions of "Run Planning Meeting Notes, October 21 - October 27, 2021"

From GlueXWiki
Jump to: navigation, search
(Friday, October 22)
Line 25: Line 25:
  
 
=Friday, October 22=
 
=Friday, October 22=
# Production runs continuing. 14:51 ARC magnet tripped 17:48 PD says a team is in looking at the power supply.
+
# Last 24h: Production runs continued smoothly until 2:51pm when an ARC magnet tripped. About 7pm the team looking at the power supply found that there was a short in any one of the 42 magnets downstream, they will resume work in the morning. [https://logbooks.jlab.org/entry/3930057 Shifts were cancelled until 9am.]
 +
#** [https://logbooks.jlab.org/entry/3929614 extra PS shielding added on Wednesday]
 +
#** [https://logbooks.jlab.org/entry/3929964 FCAL comms restored]
 +
 
 +
# Remaining issues:
 +
#* BCAL noise at 10 o'clock
 +
#* Bleedthrough
 +
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:]
 +
#* Call Chris Keith (to watch the target fill) & staff the counting house when we expect beam within 3h.
 +
#* When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
 +
#* Continue running with the solenoid on & target full until further notice
 +
#* [https://cebaf.jlab.org/files/ops/accboard/ Pass change for A&B Saturday morning (A->4 pass)]
 +
#* Expect downtime Monday morning for VIP tour, start time TBC probably ~7am.

Revision as of 22:53, 21 October 2021

<-- Summer 2021 RC meetings MCC whiteboard

Thursday, October 21

  1. Last 24h:
  2. Remaining issues:
    • Tagger hodoscope time shifts
    • communication with accel. w.r.t. tagger magnet - Paul Vasilauskis (Ops group leader): "I am putting out to my staff to contact the hall if they do need to touch the magnet and am looking into adding wording to the magnet screens"
    • BCAL noise at 10 o'clock
    • Bleedthrough
  3. Plan:
    • When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
    • Continue running with the solenoid on & target full until Friday or later
    • Pass change for A&B Saturday morning (A->4 pass)
    • Expect downtime Monday morning for VIP tour, start time TBC probably ~7am.
    • Ops will need another maintenance day before the energy change

Friday, October 22

  1. Last 24h: Production runs continued smoothly until 2:51pm when an ARC magnet tripped. About 7pm the team looking at the power supply found that there was a short in any one of the 42 magnets downstream, they will resume work in the morning. Shifts were cancelled until 9am.
  1. Remaining issues:
    • BCAL noise at 10 o'clock
    • Bleedthrough
  2. Plan:
    • Call Chris Keith (to watch the target fill) & staff the counting house when we expect beam within 3h.
    • When the beam is back continue production at 200nA after the usual checks (radiation levels & harp scans)
    • Continue running with the solenoid on & target full until further notice
    • Pass change for A&B Saturday morning (A->4 pass)
    • Expect downtime Monday morning for VIP tour, start time TBC probably ~7am.