=Saturday, October 22=
 +
=== Past 24 hours ===
 +
* past 24 hours we collected ~3.43B total triggers on the He4 target with 200nA beam.
 +
* Starting from run_num 111140 one of FCal fADC is broken
 +
* Beam was OFF from 16:37 till 19:58 issues with RF 1L10 HV
 +
* After Beam is back continued taking data at 200nA FULL target
 +
* ~00:15 DAQ rate dropped to 0kHz, Contacted to Sergey, 1st power cycled rocTOF2, which brings trigger rate to 12.5kHz, but still way far from nominal 50kHz
 +
* It turns out one of FCAL outer ring fADC is broken (trying to reach expert to replace it), will continue running with this condition until it's been replaced
 +
 
 +
 
 +
=== Shift Summarys ===
 +
* [https://logbooks.jlab.org/entry/4064773 Early Riser Oct-21]
 +
* [https://logbooks.jlab.org/entry/4065074 Day Oct-21]
 +
* [https://logbooks.jlab.org/entry/4065456 Swing Oct-21]
 +
* [https://logbooks.jlab.org/entry/4065653 Owl Oct-21/22]
 +
* [https://logbooks.jlab.org/entry/4065892 Early Riser Oct-22]
 +
 
 +
 
 +
=== Issues ===
 +
* https://logbooks.jlab.org/entry/4065801 ->FCAL fADC broken
 +
* https://logbooks.jlab.org/entry/4066109 ->Gloun-03 reboot
 +
 
 +
=== Plan ===
 +
*Continue taking production data at 200nA with FULL LHe target over the weekend.
 +
 
 +
 
 +
=Friday, October 21=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
*Continued taking data at 200nA with EMPTY Target Cell till ~15:00, collected ~0.65B events, overall collected data for past period 1.533B events
 
*Continued taking data at 200nA with EMPTY Target Cell till ~15:00, collected ~0.65B events, overall collected data for past period 1.533B events
Line 38: Line 64:
 
Continue running on the FULL LHe target at 200nA
 
Continue running on the FULL LHe target at 200nA
  
=Wednesday, October 20=
+
=Thursday, October 20=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 
*Beam was Off most of the day starting from ~7:30am for "ARW Tour and Associated Maintenance" and VCG1L1210(SRF Insulating Vacuum)
 
*Beam was Off most of the day starting from ~7:30am for "ARW Tour and Associated Maintenance" and VCG1L1210(SRF Insulating Vacuum)

Revision as of 11:03, 22 October 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Saturday, October 22

Past 24 hours

  • past 24 hours we collected ~3.43B total triggers on the He4 target with 200nA beam.
  • Starting from run_num 111140 one of FCal fADC is broken
  • Beam was OFF from 16:37 till 19:58 issues with RF 1L10 HV
  • After Beam is back continued taking data at 200nA FULL target
  • ~00:15 DAQ rate dropped to 0kHz, Contacted to Sergey, 1st power cycled rocTOF2, which brings trigger rate to 12.5kHz, but still way far from nominal 50kHz
  • It turns out one of FCAL outer ring fADC is broken (trying to reach expert to replace it), will continue running with this condition until it's been replaced


Shift Summarys


Issues

Plan

  • Continue taking production data at 200nA with FULL LHe target over the weekend.


Friday, October 21

Past 24 hours

  • Continued taking data at 200nA with EMPTY Target Cell till ~15:00, collected ~0.65B events, overall collected data for past period 1.533B events
  • 15:00 Beam was OFF for ~2.5 hours for Injector Restoration
  • At 16:10 started filling the target with LHe
  • ~17:40 Beam was back, started collecting data with 200nA and FULL target
  • 17:58 FDC:hv:2:c3:3n channel HV tripped, tried to turn it ON, with different ways, but continuously it was tripping, contacted to Lubomir he changed the HV from 500V to 400V https://logbooks.jlab.org/entry/4064442
  • 19:20 Target alarm comes ON, the Pulse Tube Refrigerator(PTR) was switched off resulting in increase of the target cell temperatures from 4.27 to about 4.6 K
  • Same Target Issue happened at 20:50 again, switched back ON the PTR, and in both cases contacted to Chris Carlin, he will keep an eye on it
  • 22:10 asked for Rapid Access to let Chris Carlin take a look on the heater/cooler control box
  • The CDC Pressure Alarm is coming ON more frequently than it was
  • Collected data for LHe ~1.9B events

Shift Summary

Issues

Plan

Continue running on the FULL LHe target at 200nA

Thursday, October 20

Past 24 hours

  • Beam was Off most of the day starting from ~7:30am for "ARW Tour and Associated Maintenance" and VCG1L1210(SRF Insulating Vacuum)
    • During dawn time Mark and Malte replaced some Fcal bases (2?)
    • Vlad and Arshak did some alignment on the prototype
    • Kondo conducted some work on GEM-TRD
  • Restored Beam to the Hall-D at ~22:30, after 15 hours of downtime
  • After Beam restoration Harp Scan was performed and started run on the Empty LHe4 Cell target with 200nA
  • Collected for about 0.3B events
  • At 7:45 meeting informed MCC about beam position instability


Shift Summary

Issues

Plan