Thursday June 30

Past 24 hours

  • no beam during the day, machine optimization to deliver high current beam to HallC (unsuccessful)
  • beam back around 5:30pm
  • did first two Harp scans with HallD laser on and off while hallC had around 17uA of beam
  • general beam conditions are rather unstable. beam strip chart
  • continue data taking over night
  • DAQ issues again with life time dropping to 60%. Shift crew called Sergey.
    • found problem with Slot 3 fiber 7 having trouble (I think this is seen in roctrig1?)
    • after Sergey's intervention DAQ came slowly back to "normal"
  • beam conditions are very unstable over night
  • Loss of NMR comm in Tagger Manet
  • again very bad life time 10% only! but also beam lost around 4am
  • beam on and off for some time, finally off with problems in several, cavity one whole zone no beam for several hours.