Difference between revisions of "Run Planning Meeting Notes, June 16 - June 22, 2022"

From GlueXWiki
Jump to: navigation, search
(Sunday June 19)
Line 8: Line 8:
  
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 +
 +
=Monday June 20=
 +
 +
#Last 24h:
 +
#*[https://logbooks.jlab.org/entry/4004689 CTOF trigger time adjusted]
 +
#*[https://logbooks.jlab.org/entry/4004707 TOF signal size.]  To compare with 400 threshold.
 +
#*[https://logbooks.jlab.org/entry/4004718 Changes to AC locks.]  Need to evaluate the impact. [https://logbooks.jlab.org/entry/4004792]
 +
#* Beam returned at 8:30 pm.  Smooth production since then.
 +
#Reports
 +
#*[https://logbooks.jlab.org/entry/4004801 Lack of TDC hits for CTOF]
 +
#*[https://logbooks.jlab.org/entry/4004338 New diamond spot analysis tool available]
 +
#Issues
 +
#*[https://logbooks.jlab.org/entry/4004511 Beam position is unstable]
 +
#*DAQ live time fluctuations. [https://logbooks.jlab.org/entry/4004956]  Tagger access tuesday to look at this.
 +
#*24 tagger channels off.  Tagger access tuesday to look at this.
 +
#Plans
 +
#*RF recovery Tuesday and machine tuning for Hall C high current.
 +
#**Change F1TDCs in Tagger that may be causing live time issues.
 +
#**Install helicity fibers in Tagger
 +
#**Change HV crate in tagger that is causing issues.
 +
#*Accelerator maintenance day Thursday
 +
#Commissioning steps temporarily postponed:
 +
#*Flux optimization/Act .Col. calibration
 +
#*PS and TAGH HV scans
 +
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
 +
  
 
=Sunday June 19=
 
=Sunday June 19=

Revision as of 08:53, 20 June 2022

↑ Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Monday June 20

  1. Last 24h:
  2. Reports
  3. Issues
    • Beam position is unstable
    • DAQ live time fluctuations. [2] Tagger access tuesday to look at this.
    • 24 tagger channels off. Tagger access tuesday to look at this.
  4. Plans
    • RF recovery Tuesday and machine tuning for Hall C high current.
      • Change F1TDCs in Tagger that may be causing live time issues.
      • Install helicity fibers in Tagger
      • Change HV crate in tagger that is causing issues.
    • Accelerator maintenance day Thursday
  5. Commissioning steps temporarily postponed:
    • Flux optimization/Act .Col. calibration
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.


Sunday June 19

  1. Last 24h:
  2. Reports
  3. Issues
  4. Plans
    • Flux optimization/Act .Col. calibration
    • RF recovery Tuesday
    • Accelerator maintenance day Thursday
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Saturday June 18

  1. Last 24h:
  2. Reports
    • From PD-RC 8:45 meeting.
      • Generally everyone is somewhat unhappy. :-(
    • CPP dEdx issues. CDC is likely fine. Its gain and hit efficiency (hits found/hits measured) are normal. But tracking is missing the start counter, & the target isn't in the usual spot.
  3. Issues
    • 24 tagger channels off.
  4. Plans
    • Flux optimization/Act .Col. calibration
    • Trigger development for TOF trigger
    • RF recovery Tuesday
    • Accelerator maintenance day Thursday
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.


Friday June 17

  1. Last 24h:
    • Tagger voltage alarms
    • Beam returned at 11 pm.
    • Harp scans performed [5][6][7]
    • Beam envelope looks good Accelerator have asked us to put these projections in the elog in future.
    • No CH edge observed. Hovanes helped to get diamond aligned overnight. [8]
    • Ran quasi production for NPP. Pressure change CDC alarm twice.
  2. Reports
    • From PD-RC 7:45 meeting.
      • Hall C not getting high current, more work is needed
      • Hall B will need a spin dance
    • Low rates in TOF [9] and low current in CDC [10]
    • Spreadsheet with list of runs
  3. Issues
    • 24 tagger channels off
  4. Plans
    • Flux optimization/Act .Col. calibration
    • Trigger development for TOF trigger
    • RF recovery Tuesday
    • Accelerator maintenance day Thursday
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Thursday June 16

  1. Last 24h:
    • No beam since last meeting
    • Still getting tagger voltage alarms (should we just turn those counters off?)
  2. Reports
  3. Issues
    • High trigger rate in CTOF
      • MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
  4. Plans:
  5. Upcoming Items:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
    • Tagger Access:
      • Change HV crate (Nick, Chris)
      • Install helicity fibers and connect to DAQ