Difference between revisions of "Run Planning Meeting Notes, June 16 - June 22, 2022"

From GlueXWiki
Jump to: navigation, search
(Friday June 17)
(Friday June 17)
Line 25: Line 25:
 
#Plans
 
#Plans
 
#*Flux optimization/Act .Col. calibration
 
#*Flux optimization/Act .Col. calibration
 +
#*Trigger development for TOF trigger
 +
#*RF recovery Tuesday
 +
#*Accelerator maintenance day Thursday
 
#*Trigger development for TOF trigger
 
#*Trigger development for TOF trigger
 
#Commissioning steps temporarily postponed:
 
#Commissioning steps temporarily postponed:

Revision as of 08:12, 17 June 2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board


Friday June 17

  1. Last 24h:
  2. Reports
  3. Issues
    • 24 tagger channels off
  4. Plans
    • Flux optimization/Act .Col. calibration
    • Trigger development for TOF trigger
    • RF recovery Tuesday
    • Accelerator maintenance day Thursday
    • Trigger development for TOF trigger
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Thursday June 16

  1. Last 24h:
    • No beam since last meeting
    • Still getting tagger voltage alarms (should we just turn those counters off?)
  2. Reports
  3. Issues
    • High trigger rate in CTOF
      • MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
  4. Plans:
  5. Upcoming Items:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
    • Tagger Access:
      • Change HV crate (Nick, Chris)
      • Install helicity fibers and connect to DAQ