=Friday June 17=
 +
 +
#Last 24h:
 +
#* No beam since last meeting
 +
#* Tagger voltage alarms
 +
#**[https://logbooks.jlab.org/entry/4003448 Nick changed card and slot again.]  Same issue.  He set the max voltage to 1100 V so an overvoltage is less serious.  The next step is to change the crate which would take a shift and need 2 people.
 +
#**[https://logbooks.jlab.org/entry/4003461 Hovanes turned counters off]
 +
#Reports
 +
#*From PD-RC 7:45 meeting.
 +
#**
 +
#*[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 +
#Issues
 +
#*
 +
#Plans
 +
#Commissioning steps temporarily postponed:
 +
#*PS and TAGH HV scans
 +
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
  
 
=Thursday June 16=
 
=Thursday June 16=
Line 17: Line 36:
 
#*High trigger rate in CTOF
 
#*High trigger rate in CTOF
 
#**MWPC #6 window cover removed.  If successful, great.  Otherwise, attempt to move helium bag downstream.
 
#**MWPC #6 window cover removed.  If successful, great.  Otherwise, attempt to move helium bag downstream.
#Plans
+
#Plans:
#*When beam comes back (swing shift?)
+
#Upcoming Items:
#**L1 trigger work (if not too late)
+
#**Flux optimization/Act .Col. calibration (2 hours) (if not too late)
+
#**Harp scans.
+
#**NPP production run overnight (even if previous item failed). Diamond, 45/135, 30nA or more possible (it will be up to NPP persons to check and tell if a higher current may be used). 
+
#Commissioning steps temporarily postponed:
+
 
#*PS and TAGH HV scans
 
#*PS and TAGH HV scans
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
 
#*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
 +
#*Tagger Access:
 +
#**Change HV crate (Nick, Chris)
 +
#**Install helicity fibers and connect to DAQ

Revision as of 15:45, 16 June 2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board


Friday June 17

  1. Last 24h:
  2. Reports
  3. Issues
  4. Plans
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Thursday June 16

  1. Last 24h:
    • No beam since last meeting
    • Still getting tagger voltage alarms (should we just turn those counters off?)
  2. Reports
  3. Issues
    • High trigger rate in CTOF
      • MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
  4. Plans:
  5. Upcoming Items:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
    • Tagger Access:
      • Change HV crate (Nick, Chris)
      • Install helicity fibers and connect to DAQ