Difference between revisions of "Run Planning Meeting Notes, June 16 - June 22, 2022"
From GlueXWiki
Line 6: | Line 6: | ||
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
+ | |||
+ | =Sunday June 19= | ||
+ | |||
+ | #Last 24h: | ||
+ | #* [https://logbooks.jlab.org/entry/4004378 TOF trigger included in data stream.] Total rate 60kHz, 400 Mpbs, ~97% live time. CTOF prescale factor 5 | ||
+ | #*[https://logbooks.jlab.org/entry/4004511 Beam position is unstable] | ||
+ | #*Smooth running overnight. [https://logbooks.jlab.org/entry/4004502 Coherent peak shape and energy looks good.] | ||
+ | #Reports | ||
+ | #*From PD-RC 8:45 meeting. | ||
+ | #** | ||
+ | #Issues | ||
+ | #*[https://logbooks.jlab.org/entry/4004511 Beam position is unstable] | ||
+ | #*DAQ live time dropped twice. [https://logbooks.jlab.org/entry/4004407][https://logbooks.jlab.org/entry/4004595] | ||
+ | #*24 tagger channels off. | ||
+ | #Plans | ||
+ | #*Flux optimization/Act .Col. calibration | ||
+ | #*RF recovery Tuesday | ||
+ | #*Accelerator maintenance day Thursday | ||
+ | #Commissioning steps temporarily postponed: | ||
+ | #*PS and TAGH HV scans | ||
+ | #*Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help. | ||
+ | |||
=Saturday June 18= | =Saturday June 18= |
Revision as of 07:32, 19 June 2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Sunday June 19
- Last 24h:
- TOF trigger included in data stream. Total rate 60kHz, 400 Mpbs, ~97% live time. CTOF prescale factor 5
- Beam position is unstable
- Smooth running overnight. Coherent peak shape and energy looks good.
- Reports
- From PD-RC 8:45 meeting.
- From PD-RC 8:45 meeting.
- Issues
- Beam position is unstable
- DAQ live time dropped twice. [1][2]
- 24 tagger channels off.
- Plans
- Flux optimization/Act .Col. calibration
- RF recovery Tuesday
- Accelerator maintenance day Thursday
- Commissioning steps temporarily postponed:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
Saturday June 18
- Last 24h:
- Live time now being written to epics archiver.
- Downstream beam pipe was moved. Opportunistic.
- Tagger NMR lost lock
- Sasha addeed TOF to triggerRates were very high. Pre-scale by 2 and thresholds raised but timing not complete yet.
- Hovanes attempted AC scan but beam was not locking
- Ran quasi production for NPP and maybe CPP.
- Reports
- From PD-RC 8:45 meeting.
- Generally everyone is somewhat unhappy. :-(
- CPP dEdx issues. CDC is likely fine. Its gain and hit efficiency (hits found/hits measured) are normal. But tracking is missing the start counter, & the target isn't in the usual spot.
- From PD-RC 8:45 meeting.
- Issues
- 24 tagger channels off.
- Plans
- Flux optimization/Act .Col. calibration
- Trigger development for TOF trigger
- RF recovery Tuesday
- Accelerator maintenance day Thursday
- Commissioning steps temporarily postponed:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
Friday June 17
- Last 24h:
- Tagger voltage alarms
- Nick changed card and slot again. Same issue. He set the max voltage to 1100 V so an overvoltage is less serious. The next step is to change the crate which would take a shift and need 2 people.
- Hovanes turned counters off
- Beam returned at 11 pm.
- Harp scans performed [3][4][5]
- Beam envelope looks good Accelerator have asked us to put these projections in the elog in future.
- No CH edge observed. Hovanes helped to get diamond aligned overnight. [6]
- Ran quasi production for NPP. Pressure change CDC alarm twice.
- Tagger voltage alarms
- Reports
- From PD-RC 7:45 meeting.
- Hall C not getting high current, more work is needed
- Hall B will need a spin dance
- Low rates in TOF [7] and low current in CDC [8]
- Spreadsheet with list of runs
- From PD-RC 7:45 meeting.
- Issues
- 24 tagger channels off
- Plans
- Flux optimization/Act .Col. calibration
- Trigger development for TOF trigger
- RF recovery Tuesday
- Accelerator maintenance day Thursday
- Commissioning steps temporarily postponed:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
Thursday June 16
- Last 24h:
- No beam since last meeting
- Still getting tagger voltage alarms (should we just turn those counters off?)
- Reports
- From PD-RC 7:45 meeting.
- Beam will be gone until Swing Shift at least
- Spreadsheet with list of runs
- From PD-RC 7:45 meeting.
- Issues
- High trigger rate in CTOF
- MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
- High trigger rate in CTOF
- Plans:
- Upcoming Items:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
- Tagger Access:
- Change HV crate (Nick, Chris)
- Install helicity fibers and connect to DAQ