Line 21: Line 21:
 
#**Hall C not getting high current, more work is needed
 
#**Hall C not getting high current, more work is needed
 
#**Hall B will need a spin dance
 
#**Hall B will need a spin dance
#*Low rates in tagger [https://logbooks.jlab.org/entry/4003634] and low current in CDC [https://logbooks.jlab.org/entry/4003635]
+
#*Low rates in TOF [https://logbooks.jlab.org/entry/4003634] and low current in CDC [https://logbooks.jlab.org/entry/4003635]
 
#*[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
#*[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
#Issues
 
#Issues

Revision as of 08:59, 17 June 2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board


Friday June 17

  1. Last 24h:
    • Tagger voltage alarms
    • Beam returned at 11 pm.
    • Harp scans performed [1][2][3]
    • Beam envelope looks good Accelerator have asked us to put these projections in the elog in future.
    • No CH edge observed. Hovanes helped to get diamond aligned overnight. [4]
    • Ran quasi production for NPP. Pressure change CDC alarm twice.
  2. Reports
    • From PD-RC 7:45 meeting.
      • Hall C not getting high current, more work is needed
      • Hall B will need a spin dance
    • Low rates in TOF [5] and low current in CDC [6]
    • Spreadsheet with list of runs
  3. Issues
    • 24 tagger channels off
  4. Plans
    • Flux optimization/Act .Col. calibration
    • Trigger development for TOF trigger
    • RF recovery Tuesday
    • Accelerator maintenance day Thursday
  5. Commissioning steps temporarily postponed:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.

Thursday June 16

  1. Last 24h:
    • No beam since last meeting
    • Still getting tagger voltage alarms (should we just turn those counters off?)
  2. Reports
  3. Issues
    • High trigger rate in CTOF
      • MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
  4. Plans:
  5. Upcoming Items:
    • PS and TAGH HV scans
    • Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
    • Tagger Access:
      • Change HV crate (Nick, Chris)
      • Install helicity fibers and connect to DAQ