Difference between revisions of "Run Planning Meeting Notes, July 28- August 3, 2022"

From GlueXWiki
Jump to: navigation, search
Line 28: Line 28:
 
=== Reports ===
 
=== Reports ===
 
=== Plans ===
 
=== Plans ===
 +
-->
 +
 
= Monday August 1 =
 
= Monday August 1 =
=== Past 24 hours ===  
+
=== Past 72 hours ===  
 +
* Fri: ~3.9B triggers
 +
* Sat: ~3.0B triggers
 +
* Sun: >2.5B triggers
 +
* Half-wave plate moved out on Sunday afternoon
 +
* [https://logbooks.jlab.org/entry/4022617 RootSpy issues] and [https://logbooks.jlab.org/entry/4022300 here]
 +
* Counting house not host of zoom meeting [https://logbooks.jlab.org/entry/4022568 log entry]
 +
* Gas shed key missing
 
=== Shift Reports ===
 
=== Shift Reports ===
* [ Day shift summary ]
+
* [https://logbooks.jlab.org/entry/4022437 Day shift summary ]
* [ Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4022559 Swing shift summary]
* [ Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4022660 Owl shift summary]
* [ Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4022736 Early Riser shift summary]
 
=== Reports ===
 
=== Reports ===
 
=== Plans ===
 
=== Plans ===
 +
* Switch to empty target during accelerator down time (>=2hr)
 +
* Production running on empty target for 1.5 days
 
= Sunday July 31 =
 
= Sunday July 31 =
=== Past 24 hours ===
 
 
=== Shift Reports ===
 
=== Shift Reports ===
* [ Day shift summary ]
+
* [https://logbooks.jlab.org/entry/4022012 Day shift summary ]
* [ Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4022103 Swing shift summary]
* [ Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4022228 Owl shift summary]
* [ Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4022308 Early Riser shift summary]
=== Reports ===
+
=== Plans ===
+
 
= Saturday July 30 =
 
= Saturday July 30 =
=== Past 24 hours ===
 
 
=== Shift Reports ===
 
=== Shift Reports ===
* [ Day shift summary ]
+
* [https://logbooks.jlab.org/entry/4021606 Day shift summary ]
* [ Swing shift summary]
+
* [https://logbooks.jlab.org/entry/4021773 Swing shift summary]
* [ Owl shift summary]
+
* [https://logbooks.jlab.org/entry/4021859 Owl shift summary]
* [ Early Riser shift summary]
+
* [https://logbooks.jlab.org/entry/4021928 Early Riser shift summary]
=== Reports ===
+
 
=== Plans ===
+
-->
+
  
 
= Friday July 29 =
 
= Friday July 29 =

Revision as of 07:01, 1 August 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Monday August 1

Past 72 hours

  • Fri: ~3.9B triggers
  • Sat: ~3.0B triggers
  • Sun: >2.5B triggers
  • Half-wave plate moved out on Sunday afternoon
  • RootSpy issues and here
  • Counting house not host of zoom meeting log entry
  • Gas shed key missing

Shift Reports

Reports

Plans

  • Switch to empty target during accelerator down time (>=2hr)
  • Production running on empty target for 1.5 days

Sunday July 31

Shift Reports

Saturday July 30

Shift Reports


Friday July 29

Past 24 hours

  • Thanks Rory for previous RC shift
  • Beam studies during Day shift
  • Mark D.: Safety walk-through
  • Beni: CTOF repair, Mark: gain equalization
  • Mark+Malte: FCAL repairs
  • Beam returned ~16:30
  • ~2.0B triggers

Shift Reports

Reports

Plans

  • Long mode run 1/2 hour
  • Production running on Pb through weekend
  • No meetings over weekend

Thursday July 28

Past 24 hours

  • Beam returned ~ noon
  • Harp scans
  • Production data taking ~ 13:30
  • ~2.9B triggers

Shift Reports

Reports

Plans

  • Beam Studies today
  • Hall-D Walk through - Mark D.
  • CTOF PMT Repair - Beni Z.
  • Production running on Pb when beam returns