Run Planning Meeting Notes, July 14 - July 20, 2022

From GlueXWiki
Revision as of 13:17, 14 July 2022 by Elton (Talk | contribs) (Issues)

Jump to: navigation, search
Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Friday July 16

Past 24 hours

  • RF Recovery Day
  • Access to investigate DIRC environment parameters (Nick)
  • Access to install crystals for testing in the PS Test Setup (Vlad)
  • Production on Empty target (~xxxx B events)
  • Production on Full Pb target (~xxx B events)

Shift Reports

  • Day shift summary
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports

Issues

Features

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

Thursday July 14

Past 24 hours

  • Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
  • Production on Full Pb target (~0.5 B events)
  • Install Empty Target (12 pm)
  • Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
  • Storm Takes Down Accelerator
  • Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr

Shift Reports

Reports

Issues

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA