Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Saturday July 17)
(Sunday July 18)
Line 9: Line 9:
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
 
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs]
  
= Sunday July 18 =
+
= Sunday July 17 =
  
 
=== Past 24 hours ===
 
=== Past 24 hours ===
  
* Production on Empty target 60 nA (~1.1 B events)
+
* Production on Full Pb target 30 nA (~xxx B events)
* Hall Access
+
** [https://logbooks.jlab.org/entry/4016008 Inserted Pb target] (Ilya)
+
** [https://logbooks.jlab.org/entry/4015979 Changed one FCAL base] (Malte/Mark)
+
** [https://logbooks.jlab.org/entry/4016032 Switched SD boards between FDC crates 11 and 12] (Cody/Ben)
+
* [https://gryphn.phys.uconn.edu/halld/cobrems/harptool_2d.cgi?harp5C11_xsigma=1.288&harp5C11_xsigma_err=0.03&harp5C11_usigma=0.9475&harp5C11_usigma_err=0.03&harp5C11_ysigma=0.8761&harp5C11_ysigma_err=0.03&harp5C11B_xsigma=1.048&harp5C11B_xsigma_err=0.07&harp5C11B_usigma=0.8293&harp5C11B_usigma_err=0.06&harp5C11B_ysigma=0.8473&harp5C11B_ysigma_err=0.15&radHarp_xsigma=1.075&radHarp_xsigma_err=0.02&radHarp_usigma=1.044&radHarp_usigma_err=0.02&radHarp_ysigma=0.7626&radHarp_ysigma_err=0.02&harp5C11_spos=102.97&harp5C11B_spos=115.11&emittance_x=0.0041&radHarp_spos=119.7&emittance_y=0.00233&collimator_spos=194.92&fit=fit+and+plot Harp Scans]
+
* Production on Full Pb target 30 nA (~2.1 B events)
+
  
 
=== Shift Reports ===
 
=== Shift Reports ===
* [https://logbooks.jlab.org/entry/4015852 Day shift summary]  
+
* [https://logbooks.jlab.org/entry/4016315 Day shift summary]  
* [https://logbooks.jlab.org/entry/4016029 Swing shift summary]
+
* [ Swing shift summary]
* [https://logbooks.jlab.org/entry/4016155 Owl shift summary]
+
* [ Owl shift summary]
* [https://logbooks.jlab.org/entry/4016232 Early Riser shift summary]
+
* [ Early Riser shift summary]
  
 
=== Reports ===
 
=== Reports ===

Revision as of 10:18, 16 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Sunday July 17

Past 24 hours

  • Production on Full Pb target 30 nA (~xxx B events)

Shift Reports

  • Day shift summary
  • [ Swing shift summary]
  • [ Owl shift summary]
  • [ Early Riser shift summary]

Reports

Issues and Features

  • Stability of beam position at Active Collimator
  • Add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • Production data on Full Pb target

Saturday July 16

Past 24 hours

Shift Reports

Reports

Issues and Features

  • Stability of beam position at Active Collimator
  • Add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • Production data on Full Pb target

Friday July 15

Past 24 hours

  • RF Recovery Day
    • Productive Recovery
    • Slow orbit drifts investigated. Source: changing up of a screen. Longterm solution will be implemented with long shutdown, requires vacuum work. Short-term: increase apertures, possibly this weekend.
    • Restoring to more stable configuration. Delivered 70 uA to Hall C for short period and ran 48 uA overnight.
    • RF trips at about 13 trips/hr.
  • Maintenance
  • Program when beam comes back
  • Solenoid ramped up to 1350 A (Tim)
  • Beam back about 9 pm.
  • Production on Empty target 30 nA (~0.08 B events)
  • Production on Empty target 60 nA (~1 B events)

Shift Reports

Reports

Issues and Features

Plans

  • Need about 6 hours to complete present cycle on empty target.
  • Insert Full Target Pb (mid afternoon)
  • Change SD card in FDC crate if Cody is available.
  • Harp scans
  • Production

Thursday July 14

Past 24 hours

  • Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
  • Production on Full Pb target (~0.5 B events)
  • Install Empty Target (12 pm)
  • Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
  • Storm Takes Down Accelerator
  • Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr

Shift Reports

Reports

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA