Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Features) |
(→Thursday July 15) |
||
Line 9: | Line 9: | ||
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
− | = | + | = Friday July 16 = |
=== Past 24 hours === | === Past 24 hours === |
Revision as of 10:04, 14 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Friday July 16
Past 24 hours
- Production on Empty target (~xxxx B events)
- Production on Full Pb target (~xxx B events)
Shift Reports
- [ Day shift summary]
- [ Swing shift summary]
- [ Owl shift summary]
- [ Early Riser shift summary]
Reports
Issues
- Stability of beam position at Active Collimator
Features
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
Thursday July 14
Past 24 hours
- Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
Shift Reports
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA