Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Past 24 hours)
Line 13: Line 13:
  
 
=== Past 24 hours ===
 
=== Past 24 hours ===
 +
* Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
 
* Production on Full Pb target  (~0.5 B events)
 
* Production on Full Pb target  (~0.5 B events)
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm)
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm)

Revision as of 08:41, 14 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Thursday July 14

Past 24 hours

  • Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
  • Production on Full Pb target (~0.5 B events)
  • Install Empty Target (12 pm)
  • Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
  • Storm Takes Down Accelerator
  • Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr

Shift Reports

Reports

Issues

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to return to Full Pb Target and continue taking production data.