Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Plans)
(Past 24 hours)
Line 15: Line 15:
 
* Production on Full Pb target  (~0.5 B events)
 
* Production on Full Pb target  (~0.5 B events)
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm)
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target] (12 pm)
* Production on Empty Target  (~xxxB events)
+
* Production on Empty Target  (~0.9B events)
 
* [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator]
 
* [https://cebaf.jlab.org/dtm/open-events?event_id=16600 Storm Takes Down Accelerator]
  

Revision as of 07:52, 14 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Thursday July 14

Past 24 hours

Shift Reports

Reports

Issues

  • We would like to add the TOF and CTOF trigger rates to EPICs/archiver

Plans

  • RF Recovery today (beam down 8.15 till ~5pm)
  • HD Refrigerator Maintenance
  • Access for Sasha and Vlad to install modules in PS Test Stand
  • Nick to work on DIRC environment
  • Following Maintenance: Plan to return to Full Pb Target and continue taking production data.