Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"

From GlueXWiki
Jump to: navigation, search
(Reports)
(Reports)
Line 24: Line 24:
 
=== Reports ===
 
=== Reports ===
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target]
 
* [https://logbooks.jlab.org/entry/4014847 Install Empty Target]
* [https://logbooks.jlab.org/entry/4014959 Beam Strip Chart Evening]
+
* [https://logbooks.jlab.org/entry/4014959 Beam Strip Chart Swing]
  
 
=== Issues ===
 
=== Issues ===

Revision as of 19:52, 13 July 2022

Back to Run Coordination Meetings:Summer2022

Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs


Thursday July 14

Past 24 hours

  • Production on lead (~2.7B events)
  • trigger changed around 10 pm, first run with the updated trigger 101033

Shift Reports

Reports

Issues

Plans