=== Shift Reports ===
 
=== Shift Reports ===
* Day shift summary [https://logbooks.jlab.org/entry/4113703Friday], [Saturday], [Sunday]
+
* Day shift summary [https://logbooks.jlab.org/entry/4113703 Friday], [https://logbooks.jlab.org/entry/4114358 Saturday], [Sunday]
 
* Swing shift summary [https://logbooks.jlab.org/entry/4113892 Friday], [Saturday], [Sunday]
 
* Swing shift summary [https://logbooks.jlab.org/entry/4113892 Friday], [Saturday], [Sunday]
 
* Owl shift summary [https://logbooks.jlab.org/entry/4114007 Saturday], [Sunday], [Monday]
 
* Owl shift summary [https://logbooks.jlab.org/entry/4114007 Saturday], [Sunday], [Monday]
* Early Riser shift summary [Saturday], [Sunday], [Monday]
+
* Early Riser shift summary [https://logbooks.jlab.org/entry/4114137 Saturday], [Sunday], [Monday]
  
 
=== Reports ===
 
=== Reports ===
Line 14: Line 14:
 
* [https://logbooks.jlab.org/entry/4113681 TAGM timing plots (Richard Jones)]
 
* [https://logbooks.jlab.org/entry/4113681 TAGM timing plots (Richard Jones)]
 
* [https://logbooks.jlab.org/entry/4113756 DIRC LED performance (Bill)]
 
* [https://logbooks.jlab.org/entry/4113756 DIRC LED performance (Bill)]
 +
* [https://logbooks.jlab.org/entry/4114222 FCAL occupancy plots (Churaman)]
 
* [https://logbooks.jlab.org/files/2023/01/4114183/HarpScanResultsExtraPolation_01212023_churamani.pdf Harp scan Saturday morning]. Convergence does not look very good, but we decided to run this way for now (amorphous runs).
 
* [https://logbooks.jlab.org/files/2023/01/4114183/HarpScanResultsExtraPolation_01212023_churamani.pdf Harp scan Saturday morning]. Convergence does not look very good, but we decided to run this way for now (amorphous runs).
 +
* [https://logbooks.jlab.org/entry/4114336 cdc currents (Beni)]
 +
* []
  
  
 
=== Issues ===
 
=== Issues ===
 
* RC volunteers needed (Beni's RC week because of his surgery, and Susan's week because she had to cancel her trip to the US). Hovanes and Simon volunteered to cover the two weeks.
 
* RC volunteers needed (Beni's RC week because of his surgery, and Susan's week because she had to cancel her trip to the US). Hovanes and Simon volunteered to cover the two weeks.
* Numerous pressure alarms.  
+
* Numerous pressure alarms. [https://logbooks.jlab.org/entry/4114307 Sensor problem? Since Saturday morning, instruction from Lubomir are that we should only acknowledge the alarms. No need for stoping the ongoing run.] [https://logbooks.jlab.org/entry/4114263 See also here.] [https://logbooks.jlab.org/entry/4114344 The suspicious sensor has been removed from the alarm (Hovanes)]
 
* Beam energy oscillation investigation: Several accelerator experts are looking at it. No consensus whether it is real or not. Since it is at the MeV level, it should not be an issue for GlueX.  
 
* Beam energy oscillation investigation: Several accelerator experts are looking at it. No consensus whether it is real or not. Since it is at the MeV level, it should not be an issue for GlueX.  
 
* 30% increase in rates compared to Summer 2020 run period.
 
* 30% increase in rates compared to Summer 2020 run period.

Revision as of 18:16, 21 January 2023

Monday January 23

Past 72 hours

  • Beam was off from Friday 7:30am to Saturday 2am due to vacuum issue in south linac.
  • Saturday: Ran on amorphous (goni), 300 nA.

Shift Reports

  • Day shift summary Friday, Saturday, [Sunday]
  • Swing shift summary Friday, [Saturday], [Sunday]
  • Owl shift summary Saturday, [Sunday], [Monday]
  • Early Riser shift summary Saturday, [Sunday], [Monday]

Reports


Issues

Plans

Friday January 20

Past 24 hours

Shift Reports

Reports

Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm(?).
  • When the beam comes back:
    • Harp scans
    • Production on goni amo radiator at 300 nA until Sunday morning.
  • Hall access:
    • Sergey F.
  • Diamond alignment: Sunday morning, ~9am.
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scot
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan