= Friday January 20 =
 
= Friday January 20 =
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for [https://logbooks.jlab.org/entry/4113138 RF work (high current push for Halls A and C)] and [repairs]. Beam came back around 5:30pm. We did harp scans, a BCM/FCup calibration, and then [https://logbooks.jlab.org/entry/4113378 ran on various amorphous radiators during the night] and [https://logbooks.jlab.org/entry/4113552 early morning]. ABU= 11.5h for the day
+
* Ran on amorphous radiator (250 nA) until 10am. Then, beam was taken away for [https://logbooks.jlab.org/entry/4113138 RF work (high current push for Halls A and C)]. Beam came back around 5:30pm. We did harp scans, a BCM/FCup calibration, and then [https://logbooks.jlab.org/entry/4113378 ran on various amorphous radiators during the night] and [https://logbooks.jlab.org/entry/4113552 early morning]. ABU= 11.5h for the day
 
* Several accesses done during the day:
 
* Several accesses done during the day:
 
** Sasha (FADC replacement for TOF)
 
** Sasha (FADC replacement for TOF)

Revision as of 08:46, 20 January 2023

Friday January 20

Past 24 hours

Shift Reports

Reports

Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm(?).
  • Hall access:
    • Sergey F.
  • Diamond alignment: ?
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scott
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan