Difference between revisions of "Run Planning Meeting Notes, January 19 - January 25, 2023"

From GlueXWiki
Jump to: navigation, search
(Friday January 20)
(Issues)
Line 21: Line 21:
 
*[https://logbooks.jlab.org/entry/4113408 Tim W. reminder on acknowledging alarms]
 
*[https://logbooks.jlab.org/entry/4113408 Tim W. reminder on acknowledging alarms]
 
* [https://logbooks.jlab.org/entry/4113027 HVB currents look high] and [https://logbooks.jlab.org/entry/4113590 follow-up] (Naomi)
 
* [https://logbooks.jlab.org/entry/4113027 HVB currents look high] and [https://logbooks.jlab.org/entry/4113590 follow-up] (Naomi)
* 30% increase in transmission compared to Summer 2020 run.
+
* 30% increase in rates compared to Summer 2020 run period.
 
**[https://logbooks.jlab.org/entry/4111933 Original finding by A. Somov]
 
**[https://logbooks.jlab.org/entry/4111933 Original finding by A. Somov]
 
**[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113029 Comparison of 2020 and 2023 for TAGH rates (A. Deur)]
Line 27: Line 27:
 
**[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo)]  
 
**[https://logbooks.jlab.org/entry/4113098 rho and pi0 yields (A. Austregesilo)]  
 
**[https://logbooks.jlab.org/entry/4113253 BCM/FCup calibration suggested by the PD], [https://logbooks.jlab.org/entry/4113276 its results] and [https://logbooks.jlab.org/entry/4113408 follow-up].
 
**[https://logbooks.jlab.org/entry/4113253 BCM/FCup calibration suggested by the PD], [https://logbooks.jlab.org/entry/4113276 its results] and [https://logbooks.jlab.org/entry/4113408 follow-up].
 +
**[https://logbooks.jlab.org/entry/4113656 the rate discrepancy after BCM/FCup calibration has been reduced by half (A. Deur)]
 
**[https://logbooks.jlab.org/entry/4113580 Ran overnight on different amo radiators]
 
**[https://logbooks.jlab.org/entry/4113580 Ran overnight on different amo radiators]
  

Revision as of 08:41, 20 January 2023

Friday January 20

Past 24 hours

Shift Reports

Reports

Issues

Plans

  • Thursday evening and Friday night:
    • Once beam come back, do Harp scans.
    • FCup test of our beam dump BCM.
    • Run 1h on the amo radiator of the goni (baseline for next runs below). 250 nA
    • Run 2h on 0.19E-4 RL amo radiator on radiator ladder (250 nA).
    • Run 2h on 1.12E-4 RL amo radiator on radiator ladder (250 nA).
    • Run (until the beam is taken away in the morning) on 3.4E-4 RL amo radiator on radiator ladder (250 nA).
  • Beam off starting Friday morning around 7:30am to fix vacuum issue in south linac, until 4pm(?).
  • Hall access:
    • Sergey F.
  • Diamond alignment: ?
  • Until then production on amorphous.
  • Link to runplan

Thursday January 19

Past 24 hours

  • Ran on empty target until 7:20am. Then, beam was taken away for beam and RF study and acceptable beam came back only Thursday at 1:10am. ABU= 4h for the day
  • refilled the target around 4:15pm.
  • Several accesses done during the day:
    • Scott
    • Sergey
    • David Lawrence
    • Cody
  • Took amorphous data, starting around 1:10am after aborted attempt to check diamond alignment.

Shift Reports

Reports

Issues

Plans

  • Beam off starting around 10am for RF study, nominally until 4pm+/-4h.
  • Hall in controlled access?
  • Diamond alignment: Friday day ? (Hovanes unavailable today)
  • Until Friday day, production on amorphous?
  • Link to runplan