Run Planning Meeting Notes, February 9 - February 15, 2023
From GlueXWiki
Zoom connect Meeting ID: 160 199 0060 / Passcode 8394
Hall D counting room white board
Contents
Wednesday February 9
Past 24 hours
- Beam back at 11:25 pm
- Shift crew forgot to change the collimator from blocking to 5 mm and start moving the collimator while the beam was on
- HARP scans
- No beam from 10 am to 10:30 pm
Shift Reports
Reports
- Statistics balance
- PARA 0/90: 19%
- PERP 0/90: 19%
- PARA 45/135: 21%
- PERP 45/135: 18%
- AMO : 24%
Issues
- Move the collimator while the beam is on
- Bleedthrough (Alex D.)
Pending:
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)