Run Planning Meeting Notes, Feb 9-Feb 15, 2017

From GlueXWiki
Revision as of 10:03, 9 February 2017 by Dalton (Talk | contribs)

Jump to: navigation, search

<- Back to Run Coordination Meetings: Spring 2017 Run


Thursday, February 9

  1. Accelerator Status
    • Slew of difficulties over Owl shift, pathlength drift, electronics problems, BPM problems
  2. Hall-D/GlueX items
    • Running last day
      • ABUs
      • Triggers
    • Coherent Peak Position difference
    • 50 kHz running
      • Smooth running, hodoscope up to 5.7 GeV turned off. Occasional glitches in the DAQ rate due to Java garbage collection (adding a few percent to deadtime.) 900 MB/s
      • What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds)
    • Monitoring
      • Monitoring coordinator (Thomas): Report every morning.
      • data monitoring shifts
      • data anomalies
    • Target IOC problem overnight
      • How to handle reboot (shift workers or experts?)
    • End run script and RCDB entries
  3. Run Plan
    • Align coherent peaks?
    • Production
  4. Offline Analysis?
  5. Any Other Business?