(Saturday, February 11)
(Saturday, February 11)
Line 7: Line 7:
 
==Saturday, February  11==
 
==Saturday, February  11==
 
# Accelerator Status
 
# Accelerator Status
#*
+
#* 2 hour down overnight for RF problem
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 
#*  Running last 24 hours
 
#*  Running last 24 hours
 
#** ABUs   
 
#** ABUs   
 
#** Triggers   
 
#** Triggers   
#* Harp scans
+
#* [https://logbooks.jlab.org/entry/3457513 Solenoid power supply transistor]
 
# Monitoring
 
# Monitoring
 
#* Low level
 
#* Low level
#** Beam properties histogram
+
#** Beam properties histogram: the issue was a change in the analysis cuts which applied to the new diamond but needed a new AMO reference
 +
#*** https://logbooks.jlab.org/entry/3457512
 
#* High level  
 
#* High level  
 
# Calibration
 
# Calibration
 
# Run Plan
 
# Run Plan
 
#* Production
 
#* Production
 +
#* Harp scan Sunday
 +
#* QS Utility scan?  Used for matching optics, 12 harp scans per plane, per harp
 +
#* Empty target run?
 
# Offline Analysis?
 
# Offline Analysis?
 
#* [https://logbooks.jlab.org/entry/3457220 bg (amorphous) beam polarization from collimator misalignment]
 
#* [https://logbooks.jlab.org/entry/3457220 bg (amorphous) beam polarization from collimator misalignment]

Revision as of 09:52, 11 February 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Saturday, February 11

  1. Accelerator Status
    • 2 hour down overnight for RF problem
  2. Hall-D/GlueX items
  3. Monitoring
    • Low level
    • High level
  4. Calibration
  5. Run Plan
    • Production
    • Harp scan Sunday
    • QS Utility scan? Used for matching optics, 12 harp scans per plane, per harp
    • Empty target run?
  6. Offline Analysis?
  7. Any Other Business?

Friday, February 10

  1. Accelerator Status
    • Difficulties on Day Shift and into Swing. Owl smooth
  2. Hall-D/GlueX items
  3. Monitoring
    • Low level
      • New channel out in FCAL; occupancy drift in single PS channel; LED signals still in some histograms, cuts coming; new statistics on some histograms (nice)
    • High level
      • Rho analysis, 30 kHz data before beam focus was tuned
        • https://logbooks.jlab.org/entry/3456928
        • timing calibration seems out; polarizations might not be good because of lack of accidental subtraction; signal to background looks great; 30% lower rho/trigger compared to Spring 2016(should improve with calibration); omega width 50% larger and yield lower by half
  4. Calibration
    • Calibration jobs are on the farm right now, hopefully ready by Sunday/Monday.
  5. Run Plan
    • Production
  6. Offline Analysis?
  7. Any Other Business?

Thursday, February 9

  1. Accelerator Status
    • Slew of difficulties over Owl shift, pathlength drift, electronics problems, BPM problems
  2. Hall-D/GlueX items
    • Running last day
      • ABUs
      • Triggers
    • Coherent Peak Position difference
    • 50 kHz running
      • Smooth running, hodoscope up to 5.7 GeV turned off. Occasional glitches in the DAQ rate due to Java garbage collection (adding a few percent to deadtime.) 900 MB/s
      • What is the data quality? (Normalized to trigger) Physics signals, (omega, rho: # per trigger, widths, backgrounds)
    • Monitoring
      • Low level monitoring coordinator (Thomas): Report every morning.
      • High level monitoring coordinator (Alex): Report every morning.
      • Cut on triggers for monitoring
      • Run DAQ when beam is gone
      • Threshold for alerting experts?
        • Run coordinator should be called for problems that limit data taking
    • Target IOC problem overnight
      • Reboot should be done by shift crew if they know how, otherwise call Deur, then cal Ito.
    • End run script and RCDB entries
  3. Run Plan
    • Align coherent peaks?
    • Production
  4. Offline Analysis?
  5. Any Other Business?