(Monday, February 24)
(Monday, February 24)
Line 37: Line 37:
 
#* [https://logbooks.jlab.org/entry/3789786 Convergence look normal]
 
#* [https://logbooks.jlab.org/entry/3789786 Convergence look normal]
 
#* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex
 
#* [https://logbooks.jlab.org/entry/3790286 Missing RCDB variables]-Alex
#* [https://logbooks.jlab.org/entry/3790042], [https://logbooks.jlab.org/entry/3790633] Calibrations not updating, should be fixed in a day or so
+
#* [https://logbooks.jlab.org/entry/3790042], [https://logbooks.jlab.org/entry/3790633] Timing calibrations not updating, should be fixed in a day or so

Revision as of 09:27, 24 February 2020

Thursday, February 20

  1. Last 24 hours
    • Smooth production running (18hrs/24hrs with beam)
  2. Reports
  3. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Friday, February 21

  1. Last 24 hours
  2. Reports
  3. Run Plan
    • Production running over the weekend
      • List for opportunistic access? Nothing scheduled now.
    • Tuesday there will be 3 hour access due to laser work
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Monday, February 24

  1. Last 48 hours
    • Production running
      • 6hr accelerator downtime Saturday afternoon due to an IOC problem that led to a series of issues [4]
      • New BCAL pedestals
      • MCC increased ion chamber trip level by 3-5%
  2. Reports/Issues