Difference between revisions of "Run Planning Meeting Notes, Feb 20-Feb 26, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, February 20)
(Friday, February 20)
Line 18: Line 18:
 
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does]
 
#* [https://logbooks.jlab.org/entry/3788140 Convergence looks as it usually does]
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 
#* [https://logbooks.jlab.org/entry/3788260 PS enhancement after beam spot move]-Justin
 +
#* [https://logbooks.jlab.org/entry/3788707 Rates]- Alexandre
 
#* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm]
 
#* [https://logbooks.jlab.org/entry/3788677 DIRC Tile Temperature alarm]
  

Revision as of 08:21, 21 February 2020

Thursday, February 20

  1. Last 24 hours
    • Smooth production running (18hrs/24hrs with beam)
  2. Reports
  3. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.

Friday, February 20

  1. Last 24 hours
  2. Reports
  1. Run Plan
    • Production running
    • Accelerator division all-hands safety meeting next Wednesday 9am-Noon. No beam.