Line 19: | Line 19: | ||
#* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | #* Intensity scan [https://docs.google.com/spreadsheets/d/1UT3o4yJ-avlIQzmZKJo2nRrgVPzYKJvGPJ0oqAn81Oo/edit?usp=sharing statistics] | ||
# Issues: | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3532231 DAQ issues] | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* Accelerator down 4hr for "restoring corners" starting around 9am. | ||
+ | #* Hall B Mott will be invasive, likely a couple hours without beam | ||
+ | #* Controlled access during accelerator downtime | ||
+ | #** Muon chamber work | ||
+ | #** FCAL? | ||
+ | #** Anyone else? | ||
# Reports (?): | # Reports (?): | ||
+ | #* [https://logbooks.jlab.org/entry/3532310 Monitoring] | ||
# Standing issues: | # Standing issues: |
Revision as of 08:40, 15 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change
- Sergey and the DAQ group high intensity studies
- Intensity scan statistics
- Controlled Access
- Issues:
- Today's run plan Google Calendar:
- Accelerator down 4hr for "restoring corners" starting around 9am.
- Hall B Mott will be invasive, likely a couple hours without beam
- Controlled access during accelerator downtime
- Muon chamber work
- FCAL?
- Anyone else?
- Reports (?):
- Standing issues: